(1) A Project Manager is at the project
kick-off meeting. He confidently states the vision and mission for the project.
This PM is exhibiting the following leadership style:
1.
Hierarchal
2.
Authoritarian
3.
Charismatic
4.
Associative
(2) You are in charge of developing a new
product for an organization. Your quality metrics are based on the 80th
percentile of each of the last three products developed. This is an example of:
1.
Statistical sampling
2.
Metrics
3.
Benchmarking
4.
Operational definitions
(3) The two closing procedures are called:
1.
Contract close out and scope
verification
2.
Contract close out and Close Project
3.
Project closure and product
verification
4.
Project closure and lessons learned
(4) During the schedule development
process the Project Manager may have to go through several iterations of the
schedule before establishing the schedule baseline. All of the following are
tools and techniques that may be used during this process:
1.
Critical Path Method, GERT, Resource
Requirements
2.
Resource Leveling Heuristics,
Mathematical Analysis, Calendars
3.
Duration compression, Resource Leveling
Heuristics, PERT
4.
GERT, PERT, Leads and Lags
(5) Which of the following models of
conflict resolution allows a cooling off period, but seldom resolves the issue
in the long term?
1.
Problem solving
2.
Withdrawal
3.
Forcing
4.
Smoothing
(6) The receiver filters messages based on
all but the following:
1.
Culture
2.
Semantics
3.
Language
4.
Distance
5.
Knowledge
(7) How much time does the typical project
manager spend communicating both formally and informally?
1.
40-60%
2.
50-70%
3.
60-80%
4.
75-90%
(8) Group brainstorming encourages all of
the following except:
1.
Team building
2.
Analysis of alternatives
3.
Convergent thinking
4.
Uninhibited verbalization
(9) The critical element in a project's
communication system is the:
1.
Progress report
2.
Project directive
3.
Project manager
4.
Customer
(10) System integration consists of:
1.
Assuring that the pieces of a project
come together at the right time
2.
Planning for contingencies that may
occur throughout the life cycle of the project
3.
The pieces of the project function as
an integration unit
4.
a and c